Posted by: Stan Russell | February 23, 2017

Aerial Photos of Pfeiffer Canyon Bridge Cracking in Half 2/23/17

Photos of Pfeiffer Canyon Bridge from a helicopter today.
Flight by Specialized Helicopters, Watsonville
Photography by Stan Russell

Pfeiffer Canyon Bridge

Pfeiffer Canyon Bridge is cracking in half. The drilling rig on the right will be drilling for two weeks to determine the geology of the area to determine how to anchor the foundation of the new bridge. Their report is due March 16, 2017

The crack is now all the way through the bridge. The rebar is holding this bridge up while the suppurt

From the surface of the roadway

The surface of Pfeiffer Canyon Bridge is cracking in half and collapsing as shown in this image. Photo by Stan Russell

Another angle to show how much the bridge has sagged while we can do nothing but wait for it to break. Photo by Stan Russell

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Categories

%d bloggers like this: